Site plans

Site Permit Review

Site Permit Review

Learn about the site approval process.


Jump To:

 
Before You Start Your Project Important Process Information Prepare Application Materials Submittal Instructions Site Modifications Project Review and Permitting Processing Times Paying Fees Helpful Resources

Site Permit Review (SPR) is a combined submittal and review process. SPR allows a development project to obtain all site approvals. City staff review plans for compliance with regulations related to stormwater, public utilities, transportation, fire, urban forestry, planning, and zoning. 

Before You Start Your Project

  • Review the Land Development Review Process to understand the major steps. It helps applicants navigate the development process and decrease turnaround times.
  • If you are seeking a land disturbance permit to clear and grade land without establishing a use or installing infrastructure, the Mass Grading process may be an option. 

 

SPR Types 

Tier One Site Plans must adhere to UDO Section 10.2.8.A and may require one of the following review processes before a building review takes place:

  • Site Permit Review (Major)
    Typically used for projects with an approved development plan where an SPR (Minor) is not applicable. Major SPR generally includes one or more of the following:
    • 12,000 square feet or more of land disturbance
    • Increase in impervious surface resulting in stormwater treatment
    • Installation of public utility improvements
      • Examples of scopes of work:
        • Installation of new roads or sewer
        • Installation of sidewalk in the right-of-way
        • Installation of a public fire hydrant 

 

  • Site Permit Review (Minor)
    Used for site-only elements associated with projects with relatively small scopes where Major SPR is not required.
    • Examples of scopes of work:
      • Parking lot striping
      • Relocation of private utilities
      • Installation of a private fire hydrant 

 

  • Site Improvements with Building Review
    Applicants may submit plans that include both site improvements and vertical construction. This process applies only if the scope meets all of the following criteria:
    • Less than 12,000 square feet of land disturbance
    • No installation of storm drain or stormwater control measures
    • No increase in impervious surface square footage
    • No additions or modifications to water or sewer mains
    • No private hydrants and no cross-access agreements
      • Examples of scopes of work:
        • Addition of 800 square feet of building space and landscaping
        • New parking islands with a mail kiosk or shelter
        • Reconstruction of a 2,000 square foot building and driveway

Important Process Information

Receiving approved stamped plans does not authorize work on-site or on infrastructure. Work may begin only after permits are officially issued and all requirements are satisfied.

Requirements may include:

  • Contractor information submitted
  • All administrative items completed (sureties, fees, payments, TCA fence inspection, etc.)
  • All holds removed (if applicable) 

Prepare Application Materials

Applicants can update project information and upload plans using the Permit and Development Portal for faster processing.

For help, you can refer to the online application guide. Visit our tips page and use the Site Permit Review Checklist as a reference to help guide your plan submittal.

Required documents:

 

Your plans must include:

  1. Cover Sheet containing:
    1. Project Data Sheet
    2. Traffic Control and Pedestrian Plan (TCPED) Notes
    3. Public Improvement Quantity Table required on ALL SPR Majors even if there are no improvements. Indicate "0" for each listed inspection type if there are no improvements.
      1. Raleigh Water permits all public mains
      2. Private water mains (4" and larger) permitted under private Infrastructure permit
      3. Private collection sewer mains permitted under private Infrastructure permit
      4. SPRs may require Plumbing Utility Permits for water/sewer services on private property
        1. Appendix D – Public Utility Notes
        2. Contractor Note (required for all water/sewer main extensions
        3. Standard Utility Notes (Utility Sheet)
        4. Sheet Index
        5. General Notes including owner and contact’s name, telephone numbers, mailing and email addresses 
          1. Administrative Action (AA) document (if tied to a Development Plan)
          2. Building Code Summary Sheet for retaining walls ≥5 feet
  2. Current plat or boundary survey
  3. Existing Conditions plan
  4. Proposed Site plan
  5. Proposed Grading and Drainage plans
  6. Proposed Sediment and Erosion Control plans (if disturbing 12,000 square feet or more)
  7. NPDES stabilization plan (if disturbing 1 acre or more)
  8. Proposed Utility plan
  9. Proposed Tree Conservation plan
  10. A 3" x 3" open block in the lower-right corner of each sheet and maintained in a consistent location throughout the plan set for placement of the City's approval stamp. This area must remain free of all text, graphics, and plan details.

Depending on your project, you may also need:

Submittal Instructions

At this step, your application materials should be ready to assemble. Your application materials must follow these rules:

  1. PDFs only unless another file type is necessary as part of the submittal process. Other types include images, Excel, or CAD files.
  2. No .ZIP files.
  3. Each document must be its own file (for example application, plans, report). Ex. If a submittal requires 1) an application form, 2) a set of plans, and 3) a calculation report, the applicant should send these as three separate files.
  4. All PDF sheets must be the same size. 

Site Modifications

Changes to an approved SPR plan (for ASR, SUB, or Tier 1) must be approved by the City.  

Modifications are classified as Minor or Major per UDO Sections 10.2.8.E.1 and 10.2.5.E.5.

Before submitting a Minor Modification Application, contact the Permit Helpline to verify eligibility. Major Modifications require a new ASR or SUB application. 

 

Site Modification Steps:

  • Submit pages 1 and 2 of the relevant application, along with a conceptual site plan and any supporting documentation, to the assigned site reviewer. Staff will determine whether the SPR can be updated directly or if the ASR or SUB must be updated first.
  • Only one Minor Modification may be reviewed at a time. 

 

Project Review and Permitting

  • Applicants will be notified by email when a project is processed. Review comments are available anytime with a registered account in the Permit and Development Portal.
  • Plans ready for permit issuance but lacking contractor information or having administrative holds will be stored for up to six months. After six months, the application is void and fees may apply.
  • Approved stamped plans do not authorize work. Work may begin only when permits are issued, and all holds are resolved. Visit Final Review for more information.

Note: SPR plans must be fully approved by all departments before submitting a Non-Residential Building Permit.

Paying Fees

fee calculator may be used to obtain an estimate of some building and trade permit fees.

Contact

 

Planning and Development
Customer Service Center

Need Help?
Use Ask Raleigh

Permit Helpline
919-996-2500

Email
sitereview@raleighnc.gov

Subscribe

 
Lead Department:
Planning and Development
Service Categories:
Land / Site DevelopmentPermits - Commercial

Related Events

  All events

Related Projects

  All projects
Scroll to top