Rawls Drive Sidewalk Project

We are installing a new sidewalk!

The Rawls Drive Sidewalk Project is the product of a successful sidewalk petition the City received in the spring of 2019.

We plan to install a five-foot-wide sidewalk with a three-and-a-half-foot setback from the curb along the east side of the street from Poole Road to Friar Tuck Road.

Adjustments to the sidewalk width and setback may be included in the final design to avoid significant impacts in certain areas as needed and determined by our Engineering staff.

Project Details

 
Type:
Sidewalks
Project Lead:
Roadway Design & Construction

Contact

 

Sam Brewer
Project Manager 

Comment Form

Lead Department:
Engineering Services
Service Unit:
Roadway Design and Construction

Subscribe

 

Design

Updated August 2022

We are finalizing the design.  

We had a virtual public meeting in January. The meeting was recorded and is linked here. 

Public Meeting Design Maps 

Next Steps

 

Advertise for construction contracts 

Phase Contacts

 

Sam Brewer, EI
Project Manager

Lead Department:
Engineering Services

Schedule

Activity Date
Public Meeting Feb. 26, 2022
Right of Way and Easement Acquisition Starts Spring 2022
Start Construction Fall 2022
Project Compete Spring 2023