Inglewood Lane

Transit, Streets, and Sidewalks

Inglewood Lane Sidewalk Project

We are installing a new sidewalk!

The Inglewood Lane Sidewalk Project was initiated as a City of Raleigh Sidewalk Petition, and with City Council Authorization became a project in April 2019. 

We are proposing to install a sidewalk along the Inglewood Lane from Yadkin Drive to Manchester Drive.

Project Details

 
Type:
Sidewalks
Project Lead:
Roadway Design & Construction

Contact

 

Cordis Yates-Thompson
Project Manager
919-996-4055

Lead Department:
Engineering Services
Participating Department:
Transportation
Service Unit:
Roadway Design and Construction

Planning

With this project we will install a 5-foot wide sidewalk set back 3.5 feet from the back of the curb from Yadkin Drive to Manchester Drive.

There may be adjustments to the sidewalk to avoid major impacts in certain areas as needed as determined by our engineering staff.

Phase Contacts

 

Cordis Yates-Thompson
Project Manager
919-996-4055

Lead Department:
Engineering Services

Project Schedule

Date Description
Project on hold pending funding.