The Aberdeen Drive Sidewalk project is the product of a successful petition the City received in the fall of 2019.
We plan to install asphalt and curb and gutter from Rose Lane to the dead end of Aberdeen Drive, and a five-foot-wide sidewalk with a three-and-a-half-foot setback from the curb along the east side of the street.
Adjustments to the sidewalk width and setback may be included in the final design to avoid significant impacts in certain areas as needed and determined by our Engineering staff.
Project Details
- Type:
-
Streets
- Project Lead:
-
Roadway Design & Construction