Aberdeen Drive, showing the roadway is not paved and lack of sidewalk.

Transportation

Aberdeen Drive Street & Sidewalk Project

We are making street improvements!

The Aberdeen Drive street and sidewalk improvement project is the result of a successful petition for street and sidewalk improvements received by the City in the fall of 2019 and authorized by City Council to proceed with design and construction on December 3, 2019

We plan to pave the dirt/gravel road, install curb and gutter, drainage improvements and construct a five-foot-wide sidewalk on a three-and-a-half-foot setback from the new curb along the east side of the street. Adjustments to the sidewalk width and setback may be included in the final design to avoid significant impacts in certain areas as needed and determined by our Engineering Staff.

Project Details

 
Type:
Streets
Project Lead:
Transportation Planning

Contact

 

Transportation Planning 
Donetta Powell
donetta.powell@raleighnc.gov

Division Manager
Sylvester Percival, PE
sylvester.percival@raleighnc.gov

Comment Form

Lead Department:
Transportation
Participating Department:
Engineering Services
Service Unit:
Mobility Strategy and Infrastructure

Subscribe

 

Planning

This project is currently awaiting funding allocation for the official design and construction. Although some preliminary design work and surveys may have been completed the project timeline scheduling has not been determined.

If you have any questions or comments pertaining to this street and sidewalk improvement project please feel free to contact us via e-mail at Petition.Specialist@raleighnc.gov or by calling (919) 996-4054. 

Lead Department:
Transportation