traffic calming project

Transportation

Traffic Calming Projects - In Construction

The City is completing 15 traffic calming projects this year!

The City is working to address speed compliance issues in Raleigh neighborhoods. We have designed several traffic calming projects to fulfill community needs. These projects are part of the Neighborhood Traffic Management Program (NTMP), which allows residents to reach out to the City so we can aid in their goal of promoting safe public streets.

Our construction contractor will begin working on these traffic calming projects in October.  

Below is a table of our projects, their scopes, and construction stages.

Project Details

 
Type:
Transportation Improvements
Project Lead:
Roadway Design & Construction
Contractors:
Lanier Construction

Contact

 

Project Manager
Eddy Mumpasi
eddy.mumpasi@raleighnc.gov 

Project Manager
Stephane Belinga
stephane.belinga@raleighnc.gov  

Comment Form 

Lead Department:
Engineering Services
Participating Department:
Transportation

Subscribe

 

Pending

Street Name Scope Start Date Stage
Brookhaven Drive
(From Glenwood Avenue to Rembert Drive)

Summer 2025

Permanent striping coming soon.

Pre-construction
Deboy Street
(From Western Boulevard to Huntingdon Drive)

Summer 2025

Permanent striping coming soon.

Pre-construction
East Martin Street 
(From Chavis Way to South State Street)

Summer 2025

Permanent striping coming soon.

Pre-construction
Fairway Drive/Suffolk Boulevard
(From Tryon Road to Carolina Pines Avenue)

Summer 2025

Permanent striping coming soon.

Pre-construction
Grove Barton Road 
(From Pinecrest Road to Doie Cope Road)

Summer 2025

Permanent striping coming soon.

Pre-construction
Hunting Ridge Road 
(From Lone Place to Litchford Road)

Summer 2025

Permanent striping coming soon.

Pre-construction
Kilcullen Drive 
(From Green Road to New Hope Church Road)

Summer 2025

Permanent striping coming soon.

Pre-construction
Lake Forest Drive
(From Falls of Neuse Road to Van Thomas Drive)

Summer 2025

Permanent striping coming soon.

Pre-construction
Longstreet Drive
(From Sawmill Road to Six Forks Road)

Summer 2025

Permanent striping coming soon.

Pre-construction
Mackinac Island Lane - South 
(From Battle Bridge Road to Marshlane Way)

Summer 2025

Permanent striping coming soon.

Pre-construction
McGuire Drive 
(From Perry Creek Road (North) to Perry Creek Road (South)

Summer 2025

Permanent striping coming soon.

Pre-construction
Milburnie Road - East 
(From Chatham Lane to Shanta Drive

Summer 2025

Permanent striping coming soon.

Pre-construction
North Bend Drive 
(From Spring Forest Road to Falls of Neuse Road)

Summer 2025

Permanent striping coming soon.

Pre-construction
South State Street 
(From Bunche Drive to Peterson Street)

Summer 2025

Permanent striping coming soon.

Pre-construction
Saint George Road 
(From Poole Road to Little John Road)

Summer 2025

Permanent striping coming soon.

Pre-construction
Willow Oak Road – West
(From Live Oak to North New Hope Road)

Summer 2025

Permanent striping coming soon.

Pre-construction
Lead Department:
Engineering Services

Construction

Street Name Scope Start Date  Stage 
Mackinac Island Lane
(From N: Marshlane Way to Barrington Dr)
Fall 2024

Construction 

 

 

Slippery Elm Drive
(From Creech Rd to Maidenhair Dr)
Fall 2024 Complete
Cooper Road
(From Poole Rd to Little John Rd)
  • Cooper Road Map
  • Neighborhood traffic circle
  • Multiway stop conversion
  • Speed cushions
Fall 2024

Construction 

 

Peterson Street

(From Garner Rd to South State Street)

  • Speed humps
  • Neighborhood traffic circle
Fall 2024 Complete
Dixie Trail
(From Hillsborough St to Wade Ave)
  • Dixie Trail Map
  • Speed humps
  • Curb bump outs
  • Speed tables
  • Intersection safety enhancements
Fall 2024

Construction 

 

Wild Wood Forest Drive
(From Wadford Dr to Thornton Rd)
  • Wild Wood Forest Drive Map
  • Speed humps
  • Neighborhood traffic circle 
  • Improved pedestrian crossing
  • Multiway stop conversion
  • Sidewalk to close two gaps along the street
Fall 2024 Construction
White Oak Road 
(N: From Anderson Dr to Lassiter Mill Rd)
Winter 2025

Construction

 

Willow Oak Road
(From N New Hope Rd to Southall Rd)
Winter 2025 Construction
Thorpshire Drive
(From Falls of Neuse Rd to Colesbury Dr)
Winter 2025 Complete
Quail Ridge Road
(From Falls of Neuse Rd to Spring Forest Rd)
Winter 2025 Construction
Dixon Drive
(From North Hills Dr to W. Millbrook Rd)
Winter 2025 Complete
Bertie Drive
(From New Bern Ave to Chatham Ln)
Winter 2025 Construction
Country Trail
(From Troutman Ln to Leesville Rd)
Winter 2025

Construction

 

Jacqueline Lane
(From Capital Blvd to Berkshire Downs Dr)
 
Winter 2025 Complete
Mine Shaft Road
(From Lead Mine Rd to Sawmill Rd)
Winter 2025

Construction

 

Sierra Drive  
(W: From Lineberry Rd to Lake Wheeler Rd)
Spring of 2025. Being completed with the Street Resurfacing Program   Complete

The contract bid award was granted to Lanier Construction.  The Notice to Proceed with construction activity was issued with an effective start date of October 7, 2024. This is a 12-month contract where all 15 projects must be substantially completed before the end of the contract period.

Lead Department:
Engineering Services