Water and Sewer

West Neuse Sewer Interceptor

Enhancement Project

This project is in the design phase and will replace approximately 26,000 feet of existing 48- and 54-inch sanitary sewer pipe with 60- and 66-inch pipe along the west side of the Neuse River. The project will be located upstream from the Neuse River Pump Station. The project is scheduled for bidding in late Fall of 2020 with construction beginning in the Winter of 2021.

The project is expected to be completed in two years. 

A sewer interceptor is a piece of a sewer network used to control the flow of wastewater. Interceptors receive this wastewater flow from interconnecting sewer lines and sometimes from stormwater runoff. This wastewater flow is then directed to a wastewater treatment plant for filtration and disinfection.

Project Details

 
Type:
Water and Sewer
Budget:
$40,000,000
Contractors:
Design Contractor - Black & Veatch

Contact

 

Janeen Goodwin, PE
Senior Project Administrator
Phone: 919-996-3494 
Office Location: 1 Exchange Plaza Suite 620
Raleigh, NC 27601

Lead Department:
Water

Pre-Approval

This phase is complete.

Lead Department:
Water

Programmed

This phase is complete.

Lead Department:
Water

Planning

This phase is complete.

Lead Department:
Water

Design

This phase is complete.

Lead Department:
Water

Right of Way Acquisition

This project is currently in permitting and easement acquisition. 

Lead Department:
Water

Construction

Phase scheduled to begin about Spring 2021.

Lead Department:
Water

Complete

Project scheduled to be completed around Winter 2022. 

Lead Department:
Water

History

Preliminary condition assessment work was completed in 2017. This assessment found a number of issues with the existing sewer system. Should these issues not be corrected, a failure of the system could occur. 

Schedule

Date Activity
Summer 2020 Project Design Complete
Winter 2021 Permitting Ongoing
Winter 2021 Easement Acquisition Complete
Winter 2021 Project Bid Complete
Spring 2021 Project Construction Begins
Spring 2023 Project Construction Complete