Improvement project will replace aging materials to meet future infrastructure capacity demand.

This project includes approximately 15,000 linear feet of 36-inch, 42-inch, 48-inch and 54-inch gravity sewer line extending along Crabtree Creek from the Crabtree Basin sewer improvements project at Mine Creek to just east of Duraleigh Road. The alignment includes six trenchless crossings; one beneath Glenwood Avenue, another beneath Blue Ridge Road, another beneath Creedmoor Road, and three along Crabtree Creek. The proposed improvements will also include a separate sewer line behind Crabtree Valley Mall to serve the businesses at the mall.

Project Details

 
Type:
Water and Sewer
Budget:
$60,700,000
Project Lead:
Raleigh Water
Contractors:
McKim and Creed Inc

Contact

 

Perry Allen, PE
Engineering Supervisor
Phone: 919-996-3466 
Office Location: 1 Exchange Plaza Suite 620
Raleigh, NC 27601

Lead Department:
Water

Subscribe

 

Design

Project phase complete.

Lead Department:
Water

Right of Way Acquisition

Current Activities:

 - Easement Acquisition 

 - Submitting/Processing Required City & State Permit Applications

 - Coordinating Stakeholder meetings with various businesses, property owners, City of Raleigh Parks, Recreation and Cultural Resources along the proposed sewer alignment.

Lead Department:
Water

Construction

Check back for future details.

Lead Department:
Water

Complete

Check back for future details.

Lead Department:
Water

History

A sewer capacity study identified a portion of the Crabtree Basin sewer near the Crabtree Valley Mall as an area in which the existing system was not adequately sized to meet future flow conditions. Improvements for providing additional system capacity required to convey the future sewer flows were developed for this portion of the Crabtree Basin sewer line. These improvements were identified in the City of Raleigh's Capital Improvement Program as the "Crabtree Valley Sewer Replacement" project.

Schedule

Date Activity
Winter 2023 Project Design Complete
Winter 2023 Permitting Complete
Spring 2024 Easement Acquisition Complete
Summer 2024 Project Bid Complete
Fall 2024 Project Construction Begins
Winter 2026 Project Construction Complete