Flooding water on Ashland Street

Stormwater

Ashland Street Drainage Improvements

Drainage Assistance Program

This project will improve the stormwater system at properties on Ashland Street that are currently experiencing flooding. The stormwater system may be upsized or upstream stormwater flow may be redirected to lessen impact to downstream properties.

Project Details

 
Type:
Stormwater
Budget:
$170,000
Project Lead:
Stormwater Management
Contractors:
McAdams (Design)

Contact

 

Chas Webb, PE
Engineering Supervisor
charles.webb@raleighnc.gov
919-996-3519

Lead Department:
Engineering Services
Service Unit:
Stormwater

Subscribe

 

Planning

This phase has been completed.

Lead Department:
Engineering Services

Design

The consultant has surveyed the area analyzed the project area and is currently working on the design of the project. The City is reviewing the design plans and applying for necessary permits.

Project Goals

  • Repair stream erosion at residential properties
  • Upsize the undersized driveway culvert under 2809 Ashland Street to prevent upstream flooding and reduce erosion at the downstream neighbor’s driveway

This project will be bundled with two other stormwater projects during the construction phase.

Lead Department:
Engineering Services

Schedule

DateActivity
Fall 2022Project Design Started
Late Spring 2025Project Design Completed
Summer 2025Bidding Phase Begins
Late Summer 2025Bidding Phase Completed
Fall 2025Construction Begins
Early 2026Construction Completed