This project will reduce flooding and fix the drainage on Bayfield Drive.
We improved the stormwater system in the city right-of-way. We will repair the drainage on a property on Bayfield Drive that is boundled with the Mourning Dove Road Drainage Assistance Project.
Project Details
- Type:
-
Stormwater
- Budget:
-
$103,000
- Project Lead:
-
Stormwater Management
- Contractors:
-
McAdams (Design)