Rose Lane Safe Access Flood Resilience Project

Roadway Flood Mitigation

Rose Lane serves approximately 54 residential homes located on four connecting streets and has a history of roadway and bridge flooding. Walnut Creek passes under Rose Lane and is part of the FEMA floodplain. The Rose Lane bridge overtops with water during severe storms, which creates a public safety issue as the roadway becomes impassable. We are planning to improve the safety and access for the community during major storms and heavy rain.

Project Details

 
Type:
Stormwater
Budget:
$310,000
Project Lead:
Stormwater Management
Contractors:
AECOM North Carolina Inc.

Contact

 

Todd Rall
Project Manager
todd.rall@raleighnc.gov
919-996-4006

Lead Department:
Engineering Services
Service Unit:
Stormwater

Subscribe

 

Planning

The current phase of the project is to evaluate up to six (6) alternatives, four (4) of which have been previously identified and two (2) as yet unidentified, on a cost-benefit basis.

Public Engagement

Raleigh Stormwater hosted two public engagement opportunities to discuss road alternatives and hear feedback from local residents. Missed a meeting? You can find detailed information about the upcoming project below.

English

Español

Lead Department:
Engineering Services

Design

We are working on contract amendment for design for city council approval. More design details will be provided after more planning.

Lead Department:
Engineering Services

Schedule

DateActivity
Winter 2024Design Begins
Fall 2025Public Meeting
Winter 2025Gather Permits
Spring 2026Bid for Construction
Summer 2026Construction Begins