This project will improve the stormwater pipes at a property on Alamance Drive and Alleghany Road which are in poor condition and causing flooding during heavy rainstorms.

Project Details

 
Type:
Stormwater
Budget:
$600,000 (Design)
Project Lead:
Stormwater Management
Contractors:
McAdams (Design)

Contact

 

Jordan Pack
Engineer
jordan.pack@raleighnc.gov
919-996-4080

 
Lead Department:
Engineering Services

Subscribe

 

Planning

This phase is complete. 

Lead Department:
Engineering Services

Design

We completed the design in December 2025 and hosted a public meeting to give updates about the design and construction of this project.

Project Goals

  • Redirect water flow on Alamance Drive
  • Replace and upsize the stormwater system under Alleghany Road

Fact Sheet and Project Maps

Maps with project improvements and a fact sheet are provided below.

Lead Department:
Engineering Services

Schedule

DateActivity
Spring 2021Planning phase begins
Summer 2024Design phase begins
Summer 2025Public meeting
Late 2025Design phase complete
Fall 2026Construction begins
Spring 2028Construction Complete