Alamance Drive Drainage Improvements

Drainage Assistance Program

This project will improve the stormwater system at a property on Alamance Drive. 

The pipe is in poor condition causing a home to flood during heavy rainstorms.

Project Details

 
Type:
Stormwater
Budget:
$335,000
Project Lead:
Stormwater Management
Contractors:
McAdams (Design)

Contact

 

Dale Hyatt, PE
Drainage Assistance Program Manager
919-996-4071

Lead Department:
Engineering Services
Service Unit:
Stormwater

Subscribe

 

Pre-Approval

This phase is complete. 

Phase Contacts

 

Dale Hyatt, PE
Drainage Assistance Program Manager
919-996-4071

Lead Department:
Engineering Services

Planning

This phase is complete. 

Phase Contacts

 

Dale Hyatt, PE
Drainage Assistance Program Manager
919-996-4071

Lead Department:
Engineering Services

Design

The consultant is working on the design for this project.

Project Goals

  • Replace the 12-inch pipe that carries stormwater underneath a structure on Alamance Drive;
  • Re-route and increase the size of the stormwater pipe to reduce home flooding; and, 
  • Study the system downstream to see how much stormwater pipes can carry and if the system will be impacted by any improvements on Alamance Drive. 

Phase Contacts

 

Dale Hyatt, PE
Drainage Assistance Program Manager
919-996-4071

Lead Department:
Engineering Services

Construction

Phase details coming soon. 

Phase Contacts

 

Dale Hyatt, PE
Drainage Assistance Program Manager
919-996-4071

Lead Department:
Engineering Services

Complete

Phase details coming soon. 

Phase Contacts

 

Dale Hyatt, PE
Drainage Assistance Program Manager
919-996-4071

Lead Department:
Engineering Services

Schedule

Date Activity
March 2021 Project planning
November 2021 Project design complete
April 2022 Project construction begins
May 2022 Project construction complete