Old stormwater pipe at a structure on Alamance Drive

Stormwater

Alamance Drive Drainage Improvements

Improving Drainage and Reducing Flooding

This project will improve the stormwater pipes at a property on Alamance Drive and Alleghany Road which are in poor condition and causing flooding during heavy rainstorms.

Project Details

 
Type:
Stormwater
Budget:
$600,000 (Design)
Project Lead:
Stormwater Management
Contractors:
McAdams (Design)

Contact

 

Jordan Pack
Engineer
jordan.pack@raleighnc.gov
919-996-4080

 
Lead Department:
Engineering Services

Subscribe

 

Planning

This phase is complete. 

Lead Department:
Engineering Services

Design

We are finalizing the design and will be complete in December 2025.

Project Goals

  • Redirect water flow on Alamance Drive
  • Replace and upsize the stormwater system under Alleghany Road

Fact Sheet and Project Maps

A fact sheet and maps with project improvements are provided at the links below.

Next Steps

 

We will have a public meeting in Spring 2026 and construction for this project is anticipated to begin Summer 2026.

Lead Department:
Engineering Services

Schedule

DateActivity
Spring 2021Planning phase begins
Summer 2024Design phase begins
Summer 2025Public meeting
Winter 2025Design phase complete
Summer 2026Project construction begins