This project will improve the stormwater system at a property on Alamance Drive. The pipe is in poor condition causing a home to flood during heavy rainstorms.
This project is bundled with the Beaver Dam Road Drainage Improvements project and the Newbold Street Drainage Improvements project.
Project Details
- Type:
-
Stormwater
- Budget:
-
$335,000
- Project Lead:
-
Stormwater Management
- Contractors:
-
McAdams (Design)