Whispering Branch Stream

Stormwater

Whispering Branch and Woodowl Drainage Project

Stormwater Drainage System Improvements

We are designing stream and stormwater improvements of Hare Snipe Creek between Whispering Branch Road and Woodowl Drive. Both roads provide a one-way in and one-way out access for residents. Roadway overtopping during storms is frequent and can prevent vehicles from safely crossing the road.

Project Details

 
Type:
Stormwater
Budget:
$175,000 (Planning)
Project Lead:
Stormwater Management
Contractors:
Kimley-Horn (Design)

Contact

 

Erik Mayr, PE
Project Manager
erik.mayr@raleighnc.gov
919-996-4077

Lead Department:
Water

Subscribe

 

Planning

This phase is complete.

Lead Department:
Water

Design

We began designing project improvements. Design considerations include raising both roads, deepening the channel, increasing the stormwater pipes sizes under Whispering Branch Road and Woodowl Drive, or constructing bridges for the two stream crossings.

We hosted a public meeting in November 2025 to share details about the project. View meeting documents below to review the project details.

Project Goals

  • Increase stormwater pipes to reduce flooding
  • Raise Woodowl Drive
  • Stabilize portions of Hare Snipe Creek.
Lead Department:
Water

Schedule

DateActivity
Winter/Spring 2024Planning begins
Fall 2025Planning complete
Summer 2026Design begins
Fall 2027Design complete
Fall 2028Construction begins
Fall 2030Construction complete