West Street Flooding

Stormwater

West Street Extension Flood Study

Improving Stormwater Drainage and Flooding

This project will find drainage improvements that will control and reduce street flooding from the West Street Extension Project.

Project Details

 
Type:
Stormwater
Project Lead:
Stormwater Management

Contact

 

Jordan Pack
Engineer
jordan.pack@raleighnc.gov
919-996-4080

David Kiker
Engineering Supervisor
david.kiker@raleighnc.gov
919-996-4074

Lead Department:
Engineering Services

Subscribe

 

Planning

We plan to complete the flood study in Winter 2026. We are also planning a short-term project for flooding at Raleigh Union Station while the long-term project is being developed.

Background

The West Street Extension Project will provide better connectivity for pedestrians, bicyclists, and vehicles supporting the increased transit associated with Raleigh Union Station and businesses on either side of the railroad tracks. and eliminate flooding at the Raleigh Union Station entrance.

What Raleigh Stormwater Is Doing

We are doing a flood study to find solutions that will reduce flooding at Raleigh Union Station on West Street. We will build a new drainage system along West Street, under the railroad tracks, and tie into the recently constructed drainage system along West Cabarrus Street.