Concrete Pipe on Sweetbriar Drive

Stormwater

Sweetbriar Drive Stormwater Project

Drainage System Improvements

An undersized stormwater pipe is causing yard, crawl space, and road flooding along Sweetbriar Drive. This project will increase the stormwater pipe size and repair other drainage issues to reduce flooding.

Project Details

 
Type:
Stormwater
Budget:
$700,000 (Design)
Project Lead:
Stormwater Management
Contractors:
Hazen & Sawyer (Design)

Contact

 

Kyle Bucher
Senior Engineer
kyle.bucher@raleighnc.gov
919-996-4068
 

Lead Department:
Engineering Services

Subscribe

 

Planning

This phase is complete.

Lead Department:
Engineering Services

Design

We reviewed the project maintenance concerns and decided a new design was needed. Design on a new project alternative will start in mid-2026 and expected to be completed in mid/late 2027.

Proposed Upgrades

We will install a new and larger stormwater pipe to reduce future flooding.

Lead Department:
Engineering Services

Schedule

DateActivity
Spring 2024Project Planning Complete
Early Summer 2024Project Design Begins
Fall 2024Survey and Field Data Collection Completed
Mid-2026Design Phase Begins
Mid-2027Design Phase Complete

Project Map

The highlighted section with red arrows represents the project area and the undersized pipe that would be upsized across Sweetbriar Drive.