An undersized stormwater pipe is causing yard, crawl space, and road flooding along Sweetbriar Drive. This project will increase the stormwater pipe size and repair other drainage issues to reduce flooding.
Project Details
- Type:
-
Stormwater
- Budget:
-
$366,360
- Project Lead:
-
Stormwater Management
- Contractors:
-
Hazen & Sawyer (Design)