Stacy Street Erosion

Stormwater

Stacy Street Drainage Improvements

Drainage Assistance Program

We will repair the eroding streambank and failing stormwater pipes at a property on Stacy Street.

Project Details

 
Type:
Stormwater
Budget:
$100,000 (Design)
Project Lead:
Stormwater Management
Contractors:
Kimley-Horn (Design)

Contact

 

Matthew Lassiter
Senior Engineer
matthew.lassiter@raleighnc.gov
919-996-3477

Lead Department:
Engineering Services

Subscribe

 

Planning

The project is over halfway completed with planning and is set to have design plans completed Summer 2026. The project will realign the stream and include erosion protection measures along the outside of the bend to prevent further erosion of the stream.

Stacy Street Erosion
Lead Department:
Engineering Services

Schedule

DateActivity
Winter 2025Project Design begins
Summer 2026Project Design complete
Fall 2026Permitting / Easement Acquisition
Late 2026Construction Bid opening
Early 2027Construction Begins

Related Projects

  All projects