Quail Ridge Stream Erosion

Stormwater

Quail Ridge Road Stream Stabilization

Stream Stabilization Program

Raleigh Stormwater will repair a quickly eroding stream between homes on Quail Ridge Road.

Project Details

 
Type:
Lakes, Streams, and Dams
Budget:
$121,000 (Design)
Project Lead:
Stormwater Management
Contractors:
WSP (Design), Transportation Field Services (Construction)

Contact

 

Matthew Lassiter
Senior Engineer
matthew.lassiter@raleighnc.gov
919-996-3477

Lead Department:
Engineering Services

Subscribe

 

Planning

The banks of the stream are severely eroding near the property. The erosion is approximately 15-inches from the home foundations and fences along the swale collapsed due to erosion.

Project Goals

  • Prevent further loss of land and potential loss of property along the stream at Quail Ridge Road.
Quail Ridge Stream Erosion

Quail Ridge Stream Erosion

Lead Department:
Engineering Services

Design

The eroded stream is the outlet of a large storm pipe that drains Quail Ridge Road. Design will either be a stream stabilization project that rebuilds and armors the stream between the homes, or the stream may be piped between the homes and armored at the further pipe outlet. Design will be managed by WSP and should be completed by Summer 2025.

Lead Department:
Engineering Services

Schedule

DateActivity
Winter 2024Project Design begins
Summer 2025Project Design complete
Fall 2025Permitting / Easement Acquisition
Winter 2025Construction Bid opening
Spring 2026Construction Begins