Poole Road Stream

Stormwater

Poole Road Stormwater Improvements

Stream Reconstruction and Headwall Repair

Residents on Poole Road and Battery Drive experience flooding and erosion from blocked and undersized stormwater pipes. We will remove the undersized pipes and replace with larger pipes to prevent clogs and flooding.

Project Details

 
Type:
Stormwater
Budget:
$162,275 (estimate)
Project Lead:
Stormwater Management
Contractors:
WSP USA Inc.

Contact

 

Kyle Bucher
Senior Engineer
kyle.bucher@raleighnc.gov
919-996-4068

Lead Department:
Engineering Services

Subscribe

 

Planning

This phase is complete.

Next Steps

 

Once the consultant completes the survey and analysis of the project area, they will prepare designs for the stream and pipe repairs.

Lead Department:
Engineering Services

Design

We are designing the project and expect to be completed Winter 2026.

Project Goals

  • Reduce streambank erosion and flooding
  • Remove undersized pipe and restore the stream
  • Repair stormwater headwalls
Lead Department:
Engineering Services

Schedule

DateActivity
Fall 2024Project Planning complete
Winter 2024Project Design Begins
Winter 2026Design Complete
Spring 2027Anticipated Construction Start

Project Map

View the project area in the map below.

Background

There is significant streambank erosion between private residential structures on Poole Road and Battery Drive. In addition, there is an existing pipe located behind 1412 Poole Road that is undersized and completely blocked with debris, causing backwater, excessive ponding upstream of the pipe, and erosion on structures at 1412 Poole Road.