Holden Street Storm Drain

Stormwater

Holden Street Drainage Improvements

Drainage Assistance Program

Raleigh Stormwater will realign a storm drain that was is currently under a property on Holden Street.

Project Details

 
Type:
Stormwater
Budget:
$55,000 (Design)
Project Lead:
Stormwater Management
Contractors:
McAdams (Design)

Contact

 

Matthew Lassiter
Senior Engineer
matthew.lassiter@raleighnc.gov
919-996-3477

Lead Department:
Engineering Services

Subscribe

 

Planning

The relocated storm pipe will have improvements along Holden Street to reduce ponding along the road during rain events.

Project Goals

  • Relocate a storm drain from underneath a home.
Holden Street Storm Drain

Holden Street Storm Drain

Lead Department:
Engineering Services

Design

Raleigh Stormwater will relocate a stormwater pipe that causes flooding in the basement of a home. The old pipe will be filled and abandoned in place. Additional curb drains will be added along Holden Street to prevent street flooding.

Lead Department:
Engineering Services

Schedule

DateActivity
Winter 2023Project Design begins
TBDProject Design complete
TBDConstruction Begins

Related Projects