Frank Street Pipe and Fence

Stormwater

Frank Street Neighborhood Improvements

Stormwater Drainage System Improvements

Raleigh Stormwater is analyzing and designing proposed stormwater improvements affecting several residences near the Frank Street corridor.

Frank Street Road Closure

Frank Street between Norris Road and Brookside Drive is currently closed due to a defect in the stormwater pipe beneath the roadway. Repairs are scheduled to take place between August 6 and August 15. The road will be reopened once the repair work is completed. For questions, please email or call at Claudia.White@raleighnc.gov or 919-717-5079.

Project Details

 
Type:
Stormwater
Budget:
TBD
Project Lead:
Stormwater Management

Contact

 

Erik Mayr, PE
Project Manager
erik.mayr@raleighnc.gov
919-996-4077

Lead Department:
Engineering Services

Subscribe

 

Planning

We are planning surveys and developing design options to improve the stormwater pipes affecting several residences near the Frank Street corridor. More information will be provided as the project continues.

Project Goals

  • Reduce flooding on residential properties
  • Update and improve existing stormwater pipes and infrastructure
Lead Department:
Engineering Services

Design

Surveys of properties in the project area are complete. Stormwater staff will work with a consultant to design the improvements Fall 2025.

Lead Department:
Engineering Services

Schedule

DateActivity
Winter/Spring 2024Project Planning begins
Fall 2025Project Design begins
Spring 2027Project Design complete
Late Summer 2027Construction begins