Brookside Drive Streambank Erosion

Stormwater

Brookside Drive Stream Repair

Drainage Assistance Program

We will build a boulder wall along an eroding streambank on Brookside Drive to stabilize the streambank and prevent more erosion.

Project Details

 
Type:
Lakes, Streams, and Dams
Budget:
$110,000 (Design)
Project Lead:
Stormwater Management
Contractors:
McAdams (Design), Transportation Field Services (Construction)

Contact

 

Matthew Lassiter
Senior Engineer
matthew.lassiter@raleighnc.gov
919-996-3477

Lead Department:
Engineering Services

Subscribe

 

Planning

This phase is complete.

Brookside Drive Streambank Erosion

Brookside Drive Streambank Erosion

Lead Department:
Engineering Services

Design

Stream banks are severely eroding on a property on Brookside Drive. The erosion is about eight (8) inches from the back porch and deck, and 28 inches from the base of the foundation. The project will not control flood issues and is for stream stabilization only.

Project Goals

  • We will repair 70 feet of streambank and install a 40 feet long and 4 feet tall boulder wall.
Lead Department:
Engineering Services

Schedule

DateActivity
Winter 2023Project Design begins
Spring 2025Project Design complete
Spring 2026Permitting / Easement Acquisition
Summer 2026Construction Bid opening
Late Summer 2026Construction Begins