We will build a boulder wall along an eroding streambank on Brookside Drive.

Project Details

 
Type:
Lakes, Streams, and Dams
Budget:
$66,000 (Survey and Easements)
Project Lead:
Stormwater Management
Contractors:
McAdams (Design), Transportation Field Services (Construction)

Contact

 

Matthew Lassiter
Senior Engineer
matthew.lassiter@raleighnc.gov
919-996-3477

Lead Department:
Engineering Services

Subscribe

 

Planning

Streambanks are severely eroding on a property on Brookside Drive, about eight (8) inches from the back porch and deck, and 28 inches from the base of the foundation. We will stabilize the streambank to prevent more erosion. The project will not control flood issues and is for stream stabilization only.

Project Goals

  • Prevent further land loss and potential property loss along the stream.
Brookside Drive Streambank Erosion

Brookside Drive Streambank Erosion

Lead Department:
Engineering Services

Design

We will repair 70 feet of streambank and install a 40 feet long and 4 feet tall boulder wall.

Lead Department:
Engineering Services

Schedule

DateActivity
Spring 2024Project Design begins
Spring 2025Project Design complete
Summer 2025Permitting / Easement Acquisition
Winter 2025Construction Bid opening
Early 2026Construction Begins

Related Projects