A yard on Beaver Dam Road where an underground stormwater pipe is being replaced.

Stormwater

Beaver Dam Road Drainage Improvements

Drainage Assistance Program

This project will improve the stormwater system at a property on Beaver Dam Road. The stormwater pipe is in poor condition and could potentially fail if it is not replaced.

This project is bundled with the Alamance Drive Drainage Improvements project and the Newbold Street Drainage Improvements project.

Project Details

 
Type:
Stormwater
Budget:
$87,000
Project Lead:
Stormwater Management
Contractors:
McAdams (Design)

Contact

 

Jordan Pack
Engineer
jordan.pack@raleighnc.gov
919-996-4080

Lead Department:
Engineering Services
Service Unit:
Stormwater

Subscribe

 

Pre-Approval

This phase is complete. 

Lead Department:
Engineering Services

Planning

This phase is complete. 

Lead Department:
Engineering Services

Design

We are working with the consultant to design the project.

Project Goals

  • Replace the 24-inch concrete pipe that runs underneath a structure at a property on Beaver Dam Road; and, 
  • Re-route the stormwater pipe to the east of the structure.
Lead Department:
Engineering Services

Schedule

DateActivity
Winter 2021Project Planning complete
Summer 2024Project design begins
TBDConstruction begins