March 12, 2025
This winter has seen bitterly cold temperatures and even some snow. This type of weather is not very conducive to roadway construction work. See the February update post for more about cold weather and construction impacts. The good news is that Carolina Sunrock has shifted its team to work on items not as affected by weather, keeping the project moving. Even with cold and snowy weather, the project management team is happy to say the project is on schedule, and crews are making excellent headway with the project.
There is a new sidewalk from Homewood Banks Drive to just shy of Glen Eden Drive. The multi-use path is also coming along nicely from Glen Eden Drive to Duraleigh Road, and the new stormwater system along the roadway is moving along as well. The team just finished installing the storm drain system at Homewood Banks Drive and will now start working on the other half of the roundabout.
In the next few weeks, you should see more of the sidewalk and multi-use path installed and work on the other half of the roundabout at Homewood Banks Drive. A crew is also installing the root bridge near Glen Eden Drive. This root bridge is a concrete sidewalk built over the tree roots. Stay tuned for more about how the root bridge works. Once we get some drier weather, the contractor will start work back up in the area between Glen Eden and Noremac Drive.
February 5, 2025
Due to large swings in the temperature during the winter months in North Carolina, roadway construction can be hard. When Raleigh has very cold temperatures, as it did in January, crews are not able to do either concrete or asphalt work. Both asphalt and concrete require the air and ground to be at certain temperatures. If the temperature is too cold, asphalt will not stick, and concrete will not cure properly.
With the warmer weather Raleigh has had in the last few weeks, the crews have made some good headway.
This month, crews are working on:
- Paving a section of the new multi-use path
- Sanitary sewer, water, and stormwater lines between Homewood Banks Drive and Glen Eden Road
- The installation of the new sidewalk along the roadway, and
- Grading operations for widening and realignment of the roadway