An eroded stream at a property on Hunting Ridge Road.

Stormwater

Hunting Ridge Road Streambank Stabilization

Drainage Assistance Program

This project will repair the eroded stream that flows through the backyard of a property on Hunting Ridge Road. The project is bundled with the Northbrook Drive Streambank Stabilization project.

Project Details

 
Type:
Stormwater
Budget:
$180,000
Project Lead:
Stormwater Management
Contractors:
McAdams (Design)

Contact

 

Gilles Bellot, PE
Senior Project Manager
gilles.bellot@raleighnc.gov
919-996-4001

Lead Department:
Engineering Services
Service Unit:
Stormwater

Subscribe

 

Pre-Approval

This phase is complete. 

Lead Department:
Engineering Services

Planning

This phase is complete. 

Lead Department:
Engineering Services

Design

The consultant completed the design for the project. The unnamed stream to Mine Creek is eroding in the backyard of a property on Hunting Ridge Road. The erosion is within 10 feet of the foundation of the home, which causes safety concerns. 

Project Goals

  • Use boulders to stabilize 80 feet of the streambank; 
  • Fix the slope of the streambank; and, 
  • Plant on the streambank. 
Lead Department:
Engineering Services

Construction

The contract was selected early 2024 and construction will begin Spring 2024.

Lead Department:
Engineering Services

Complete

Phase details coming soon. 

Lead Department:
Engineering Services

Schedule

Date Activity
Spring 2021 Project planning
Fall 2022 Project design complete
Early 2024 Project bidding completed
Spring 2024 Project construction begins