paved greenway trail

Parks and Recreation

Big Branch Greenway Connector

3.5+ Mile Greenway Trail

The City of Raleigh is moving forward with a major new greenway trail project. The Big Branch Greenway Connector will expand our greenway system by more than three miles, creating a safer and more connected way to walk, run, or bike through Midtown and nearby neighborhoods.

We’ve gathered community input, studied possible route options, and are now preparing to finalize the trail alignment and advance design.

Over the past year, the City held outreach for four segments of the Big Branch Connector. Hundreds of residents shared ideas at open houses, pop-up events, and through online surveys.

In the most recent survey, over 1,600 people gave feedback on possible routes for Segment 1. View the survey results.

What’s Next

This project will close a critical gap in Raleigh’s greenway network and strengthen connections between neighborhoods, parks, and transit. More than 7,000 residents live within a half mile of the proposed route, with thousands more on the way. This project builds on decades of planning to create a more connected Raleigh for everyone. We are excited for this project to move into the permitting and construction phase. Construction is scheduled to be complete in the summer of 2028.

Why This Project Matters

Raleigh’s greenway system is one of the City’s most loved amenities. The Big Branch trail will extend this network into a fast-growing area that currently has limited access to parks and trails.

This connector is the top-ranked trail in Raleigh’s 2022 Greenway Master Plan and a key recommendation in the 2020 "Walkable Midtown: The Midtown - St Albans Area Plan." It was prioritized based on factors like population, transit access, and park service.

The trail will put nearly 7,000 neighborhood residents within a short walk of the greenway and bring trail users closer to nearby parks, shopping, and future bus rapid transit stops. As the area grows, more than 10,000 residents will benefit from this greenway access. 

The project also supports environmental health. The City will restore parts of Big Branch Creek and add features to manage stormwater and protect the stream.

About the Project

The Big Branch Greenway Connector will stretch from the Crabtree Creek Trail to Cedar Hills Park. The project is divided into six segments, which will be built through a mix of City investment, private development, and future planning. 

  • Segment 1A: Crabtree Creek Trail to Six Forks Rd (Parks Bond-Funded)
  • Segment 1B: Six Forks Rd to Wake Towne Dr (Parks Bond-Funded)
  • Segment 2: Midtown Multi-Modal Bridge (Raleigh Transportation)
  • Segment 3: Midtown Multi-Modal Bridge to St Albans Dr (Private Developer)
  • Segment 4: St Albans Dr to Hardimont Rd (Parks Bond-Funded)
  • Segment 5: Hardimont Rd to E. Millbrook Rd (Raleigh Transportation)
  • Segment 6: E. Millbrook Rd to Sandy Forks Rd (Parks Bond-Funded Study)

Once completed, the Big Branch Connector will link neighborhoods to key destinations like parks, schools, shops, and future transit stops. It also supports environmental goals by including stream restoration and green infrastructure improvements. 

Project Timeline: 2024 - 2028

Interactive map of Park Projects
2022 Parks Bond Spending Tracker
List of Park Projects

Project Details

 
Type:
Greenways and Trails
Budget:
$4,480,000
Contractors:
Design Consultant - Kimley Horn

Contact

 

Raleigh Parks
Planning and Public Engagement
Kris Nikfar, Engineer
kris.nikfar@raleighnc.gov

Engineering Services
Design and Construction
Dale Tiska, Senior Construction Project Manager
dale.tiska@raleighnc.gov

Lead Department:
Parks, Recreation and Cultural Resources
Participating Department:
Engineering ServicesPlanning and Development

Subscribe

 

Planning

No planning phase involved in this bond project. The Capital Area Greenway Master Plan was adopted by City Council in 2021.

Design

The project team is identifying specific alignment options for each section of the project for further design development.

Big Branch Greenway Connector Corridor Map
Lead Department:
Engineering Services

Construction

Complete


Project Schedule

DateActivity
Sept. 8, 2025Greenway Committee
Oct. 16, 2025Parks, Recreation and Greenway Advisory Board
Nov. 18, 2025City Council Presentation
Spring 202660% Design
Fall 202690% Design
Late 2026Easement Acquisition
Summer 2027Begin Construction
Summer 2028Construction Complete