New Design Manual
- TC-1A-2024 Stormwater Design Manual Update v6.2
- TC-1B-2024 Stormwater Design Manual Update UDO Related Changes
Approval Process and Timeline
The Stormwater Design Manual is incorporated into the City’s Unified Development Ordinance (UDO) by reference; therefore, changes must be approved by the City Council. The Stormwater Design Manual was be presented to the Stormwater Management Advisory Commission (SMAC), most recently in January 2024. Before reaching City Council, the Manual will be discussed by the and the Planning Commission and their Text Change Committee.
DATE | ACTIVITY |
---|---|
December 2023 and January 2024 | Presented manual to SMAC |
April 17, 2024 | Present manual to Planning Commission Text Change Committee |
June 25, 2024 | Present manual to Planning Commission |
Early Fall 2024 | Present manual to City Council |
After City Council Approval | Training for Designers |
60 days after City Council Approval | Manual Effective |
Previous Drafts
Two public meetings on were held to discuss the manual in 2019. Two previous drafts of the manual were released in 2020 and 2021.
- Draft Version 1 documents, comments (ended July 2020), and responses.
- Draft Version 2 documents, comments (ended September 2021), and responses.
- Draft Version 3 Stormwater Design Manual and Comments with Responses.
- Draft Version 4 Stormwater Design Manual and Comments with Responses.
- Draft Version 5 Stormwater Design Manual.
- Draft Version 5 Stormwater Design Manual (with mark-ups).
- Draft Version 6 Stormwater Design Manual (with mark-ups).