Stormwater Design Manual Draft Version 2


Jump To:

 
Draft Documents Version 2 Chapters Checklists Sample Plans Version 2 Feedback Responses to Comments

Draft Documents

The following draft version 2 documents are provided for reference during the manual feedback process.  

Changes between the first and second draft included:  

  • Clarifying what's needed for lot grading plans;  
  • Removing duplicate requirements for land disturbance activity; and,  
  • Explaining construction buffer zones more clearly. 

Checklists

Use Stormwater Design Manual Checklists to make sure you have all the items required for your development project.

Sample Plans

Version 2 Feedback

Feedback on the Manual was collected in September 2021. Read the feedback and comments.

Contact

 

Sally Hoyt, PE
Stormwater Review Supervisor
sally.hoyt@raleighnc.gov
919-996-4388