The City is consulting with Alpha & Omega to design repairs and replacement of two pedestrian structures at Shelley Lake Loop Trail. However, due to current plans by the City of Raleigh Public Utilities Department to begin a sewer utility replacement project these bridge repairs and replacements are on hold to better coincide with the sewer construction project schedule.
The Capital Area Greenway System was first adopted by City Council in 1976. This plan proposed a system of linear parks located primarily along rivers, streams, and creeks, and included the opportunity for an interconnected system of pedestrian trails across the region.