Jump To:
¿Habla español? Haga clic aquí para ver esta página en español.
Grow Your Business with the City of Raleigh's Projects!
The City of Raleigh has many project opportunities for underutilized businesses to participate in. If your business aligns with one or more of the procurement types below, there may be opportunities on the horizon in 2025 and beyond!
- Construction: General construction, concrete flatwork, paving, grading, seeding, segmental retaining walls, site/civil work, and roofing.
- Transportation and Traffic: Trucking, erosion control, pavement marking, thermoplastic marking, striping, traffic control, signals.
- Utilities and Infrastructure: Water and sewer, electrical, plumbing, HVAC, rebar installation, and hydrant maintenance/painting.
- Landscaping and Site Restoration: Fencing, landscaping, site restoration, and metal railings.
- Specialty Services: Fire/Life Safety, chemical supply, engineering/survey, and service contracts.
- Building Trades: All building trades, including painting, demolition, and mechanical work.
All active bids can be found on the North Carolina electronic Vendor Portal (eVP). To view the City’s projects, select 'City of Raleigh' under the Department filter. Follow the instructions to apply.
This information is for informational purposes only and does not guarantee or promise a contract award. Contract decisions will be made based on a thorough evaluation of all relevant factors in line with applicable procedures.
Construction Projects: Invitations to Bid
Project Name | Project Description | Possible Trades | Anticipated Posting Date on EVP |
|---|---|---|---|
Durant Road 36-inch Transmission Main | Water transmission main to serve eastern portion | Asphalt, concrete, cleaning, landscape, restoration, survey, traffic control, trucking | October 2025 |
Pullen Park Lake Howell Improvement | Rebuild retaining wall along lake shore | segmental retaining wall, paving, metal railing | October 2025 |
Pullen to Bain Transmission Main | Reinforcing main project for system reliability | Asphalt, concrete, clearing, landscape restoration, survey, traffic control, trucking | October 2025 |
Wake Bus Rapid Transit New Bern Avenue - Package 3 | New Bern Avenue BRT outside beltline + vertical stations | Trucking, concrete, clearing, signals, traffic control, pavement marking, water and sewer, stations, steel | October 2025 |
Wakefield Pines Dr Signal Installation | Install two traffic signals at school locations | An NCDOT approved signal contractor | October 2025 |
Churchill Road Stormwater Repair Project | Replacement and Cured in Place Pipelining of stormwater system | Concrete, landscaping, clearing, stormwater installation | October 2025 |
Old Wake Forest Road | Widening of Dixie Forest Road and Old Wake Forest Road from Spring Forest Road to Capital Blvd | trucking, clearing, grading, utilities, storm drain, asphalt paving & marking, landscaping, soil erosion control & concrete work | October 2025 |
Fleet Maintenance Operations Heavy Equipment Shop | Construction of a Heavy Equipment shop | All building trades, asphalt, concrete | November 2025 |
Lassiter Mill Greenway Construction |
|
| November 2025 |
Lake Johnson Principal Spillway Repairs | Concrete repairs to dam spillway | Concrete Repairs | November 2025 |
Group C Sidewalks | Sidewalk addition for haps on Capital Blvd, Wade Ave, Wake Forest Rd, Maywood Ave
| Concrete, utility, grading, landscaping, erosion control | November 2025 |
Crabtree Creek Interceptor Phase III | Large diameter sewer for additional capacity | Asphalt, concrete, cleaning, landscape, restoration, survey, traffic control, trucking | December 2025 |
Green Road Park Improvements | Enhancement of site accessibility and improvement of park | Site work, general trades | December 2025 |
S Saunders LAPP | Enhance safety and convenience for vehicle, bike, and ped traffic between Lake Wheeler Rd and South St | concrete, grading, box culverts, clearing and grubbing, utility stormwater, asphalt, testing, inspections | December 2025 |
Walnut Creek Lift Station Bar Screen System Replacement | Replace bar screen system at large wastewater lift station | Asphalt, concrete, survey, trucking | January 2026 |
Complete Streets Group 3 | Pedestrian improvements for ADA compliance along MLK Blvd, West / Harrington & Cabarrus Streets
| Grading, utilities, storm drain, asphalt paving & marking, soil erosion control & concrete work | January 2026 |
2026 NTMP & Bike Projects | Traffic calming projects and bike projects |
| February 2026 |
Biltmore Hills Tennis Improvements | Addition of 8 new tennis courts and associated site improvements at Biltmore Hills Park
| Demolition, grading, site, paving, landscaping, erosion control. electrical, tennis courts | February 2026 |
Poole Road Expansion Project | Expansion of existing Poole Road Maintenance Facility | All building trades | February 2026 |
Upper Durant Wetland Conversion Project | Wetland Conversion of Upper Durant Lake | All building trades | February 2026 |
Buffaloe/New Hope ped Safety Improvements | Add MUP facilities along Buffaloe Rd from New Hope to Valley Stream Dr
| concrete, utility, grading, landscaping, erosion control | February 2026 |
FY23 Design Petition | Add pedestrian connectivity and safety enhancements to streets throughout the city
| concrete, utility, grading, landscaping, erosion control | February 2026 |
Stormwater Rehabilitation Bundle 2 | Rehabilitation of stormwater pipes | Traffic control, pipe rehabilitation | March 2026 |
Police Evidence Facility | Construction of a Police Evidence facility and storage | All building trades, asphalt, concrete | April 2026 |
Pullen Aquatic Center Filtration Replacement | Replacement of sand filtration system with UV light filtration system
| Plumbing, pools | April 2026 |
Fire Station No.15 | Construction of a new fire station | All building trades, asphalt, concrete | May 2026 |
Sweetbriar Drainage Improvement Project | Mitigate crawl space and yard flooding at Sweetbriar Drive and adjacent properties
| All building trades | June 2026 |
Fire Station No.1/Fire Administration/Regional E-911 | Construction of a new fire station | All building trades, asphalt, concrete | August 2026 |
ADA Joint Count/City Operations Facility | Construction of a new operations facility | All building trades, asphalt, concrete | March 2027 |
Professional Services: Request for Qualifications
Project Name | Project Description | Possible Trades | Anticipated Posting Date on EVP |
|---|---|---|---|
Wake Bus Rapid Transit Nothern Corridor Preliminary Design & NEPA | Professional services for preliminary design and environmental work for Wake BRT Northern Corridor projects | Design and Engineering | January 2026 |
Vehicle Fleet Heavy Equipment Shop | New facility construction | All building trades |
|
Services: Request for Proposals
Project Name | Project Description | Possible Trades | Anticipated Posting Date on EVP |
|---|---|---|---|
Facilities Maintenance | New roofs buildings 400, Terminal Drive | Roofing | October 2025 |
Facilities Maintenance | New roof on 5380 Raynor Rd, Garner | Roofing | October 2025 |
Facilities Maintenance | Replace 13 HVAC units buildings 100-400 | HVAC | October 2025 |
Facilites Maintenance | Replace 8 HVAC units Wake Forest | HVAC | October 2025 |
2026 Micromobility RFP | Solicitation for micromobility operators to support Raleigh's micromobility program |
| January 2026 |
Project Name | Project Description | Possible Trades | Anticipated Posting Date on EVP |
Transfer Switches | Annual inspections of automatic transfer switches. This is equipment used to move from standard building power to generator power at facilities deemed critical in nature and are manage by Facilities and Operations | Electrical | March 2026 |
Uninterruptible Power Supply (UPS) | Bi-annual inspections to critical equipment (UPS system) used back-up power supply. This system removes any downtown/eliminates blips between standard building power and generator power. | Electrical | March 2026 |