valley lake drive stream

Stormwater

Valley Lake Drive Streambank Stabilization

Drainage Assistance Program

There was severe streambank erosion affecting the dam embankment to Valley Lake. This project repaired about 100 feet of the stream. 

Project Details

 
Type:
Lakes, Streams, and Dams
Budget:
$43,000
Project Lead:
Stormwater Management
Contractors:
Timmons Group (Design)

Contact

 

Ana Jaramillo, PE
Project Manager
919-996-4028

Lead Department:
Engineering Services
Service Unit:
Stormwater

Subscribe

 

Pre-Approval

This phase is complete. 

Phase Contacts

 

Ana Jaramillo, PE
Project Manager
919-996-4028

Lead Department:
Engineering Services

Planning

This phase is complete. 

Phase Contacts

 

Ana Jaramillo, PE
Project Manager
919-996-4028

Lead Department:
Engineering Services

Design

The consultant finished the design for this project in March. 

Phase Contacts

 

Ana Jaramillo, PE
Project Manager
919-996-4028

Lead Department:
Engineering Services

Construction

This phase is complete. 

    Phase Contacts

     

    Ana Jaramillo, PE
    Project Manager
    919-996-4028

    Lead Department:
    Engineering Services

    Complete

    This project is complete. Crews improved the streambank by:

    • Fixing the slope of the streambank;
    • Installing large rock (stone toe) along the base of the streambank; and,
    • Adding plants to protect the streambank. 
    A stream that was repaired on Valley Lake Drive

    Phase Contacts

     

    Ana Jaramillo, PE
    Project Manager
    919-996-4028

    Lead Department:
    Engineering Services

    Schedule

    Date Activity
    April 2019 Project planning and design phase
    March/April 2020 Project design complete
    August 2020 Project construction begins
    September 2020 Project construction complete