Rocky Branch Interceptor Replacement Project

Replacement project to prepare sewer system for wet weather events that may produce higher amounts of storm water.

Design is complete and the project is being approved and permitted. Easement acquisition will take place in Summer 2021. The project will bid to contractors in Fall 2021 and construction will begin late 2021 or early 2022, with completion expected in Late 2022. The project consists of replacement of existing sewer pipe that is undersized for wet weather events. The project area is located between Martin Luther King Blvd and Fayetteville Street and parallels the Rocky Branch greenway south of downtown Raleigh.

Project Details

 
Type:
Water and Sewer
Budget:
$5,000,000
Project Lead:
Matthew Cotton, PE
Contractors:
Highfill Infrastructure

Contact

 

Matthew Cotton, PE
Senior Project Administrator
Phone: 919-996-3528 
Office Location: 1 Exchange Plaza Suite 620
Raleigh, NC 27601

Lead Department:
Water

Subscribe

 

Pending

This phase is complete.

Lead Department:
Water

Pre-Approval

This phase is complete.

Lead Department:
Water

Programmed

This phase is complete.

Lead Department:
Water

Planning

This phase is complete.

Lead Department:
Water

Design

Design is complete and the project is being approved and permitted. 

Lead Department:
Water

Right of Way Acquisition

Phase details coming soon. 

Lead Department:
Water

Construction

Phase expected to start in Winter 2021.

Lead Department:
Water

Complete

Phase expected to be complete in Fall 2022.

Lead Department:
Water

History

There have been several Sanitary Sewer Overflows during wet weather events in the Rocky Branch area. Due to these events, and the possible damage to the environment that these events can cause, current sewer infrastructure in the area will be replaced.

Schedule

Date Activity
Summer 2020 Project Design Complete
Spring 2021 Permitting Complete
Summer 2021 Easement Acquisition Complete
Fall 2021 Project Bid Complete
Late 2021 / Early 2022 Project Construction Begins
Winter 2022 Project Construction Complete