Quail Hollow Water Main Replacement Project

Replacement project to prepare water system for future demands.

This project consists of replacement of an existing water pipe that has reached the end of its useful life. New materials will be used to upgrade this section of water infrastructure. Replacement of existing cast iron mains that are subject to increased occurrence of breakage. Affected streets: Quail Hollow Dr.; Kevin Cir; Hemingway Dr; Emory Ln; Langford Pl; Vernon Terrace; Marvin Pl; Lakemont Dr; Indian Trail Dr; Scollay Ct; Chardon Ct; Country Ct; Saddle Ct; Fieldstone Dr; Dantree Pl; Autumn Ct; Emerson Dr; Kenwood Ct; Christman Ct; Kirkwood Ct; Cliffwood; Blakewood Ct; Tarrywood Ct; Cedarwood Ct; Cedar Hill Ct; Cedarcrest Ct; Westerwood Ct; Ashby Pl.

Project Details

 
Type:
Water and Sewer
Budget:
$3,400,000
Project Lead:
Raleigh Water
Contractors:
Carolina Civil

Contact

 

Courtney Licata 
Senior Engineer
Phone: 919-996-3484 (Office)
Office Location: 1 Exchange Plaza Suite 620
Raleigh, NC 27601

Lead Department:
Water

Subscribe

 

Planning

This phase is complete.

Lead Department:
Water

Design

Project has bid and a contractor has been selected. Construction will begin in early 2022 and be complete in late 2023.

Lead Department:
Water

Right of Way Acquisition

Phase details coming soon.

Lead Department:
Water

Construction

Crews from Carolina Civilworks began construction on Kenwood Court, Blakewood Court, and Saddle Court the week of November 6. Construction of water main improvements on these streets will be complete by the end of the month. Residents will notice patching and paving of the water main cuts and cleanup of the work area(s).

Blakewood
Lead Department:
Water

Complete

Phase details coming soon.

Lead Department:
Water

History

The existing water pipe is cast iron and was installed in the 1950s. This will be replaced with ductile iron pipe.

Schedule

Date Activity
Spring 2021 Project Design Complete
Spring 2021 Permitting Complete
Fall 2020 Easement Acquisition Complete
Summer 2021 Project Bid Complete
Summer 2022 Project Construction Begins
Winter 2023 Project Construction Complete