Oregon Trail 24-inch Waterline

Improvement project will replace aging materials to meet future infrastructure capacity demand.

This project includes approximately 10,000 linear feet of 24-inch water transmission line along Hebron Church Road and New Bethel Church Road in Garner.

Project Details

 
Type:
Water and Sewer
Budget:
$3,600,000
Project Lead:
Lorea Sample
Contractors:
Moffat Pipe, Inc.

Contact

 

Lorea Sample
Senior Project Manager
Phone: 919-996-3484 
Office Location: 1 Exchange Plaza Suite 620
Raleigh, NC 27601

Lead Department:
Water

Subscribe

 

Planning

This phase is complete.

Lead Department:
Water

Design

This Phase is Complete.

Lead Department:
Water

Construction

Project began construction in Summer 2021. Construction of the 24" water line on Hebron Church Rd, Clifford Rd, New Bethel Church Rd, and Oregon Trail are now complete. Construction crews are currently on-site at the DE Benton Water Treatment Plant where a venturi water meter was installed February 2022. The construction phase of this project will soon be complete with the finishing of the meter vault onsite at the DE Benton Water Treatment Plant. Concrete was poured around the pipe to provide additional protection and stability.

Encasement-rebar

Pipe encasement.

Pipe-encasement-concrete-vault

Pipe encasement.

Pipe-encasement-concrete-vault

Pipe encasement.

DEB-Meter-Housing

Meter Housing

DEB-Meter-Housing

Meter Housing

Lead Department:
Water

Complete

Project scheduled to be completed in Spring 2021.

Lead Department:
Water

History

This project was identified in the Water System Master Plan as a capacity upgrade need in the 532-pressure zone found in Garner, NC. Funding for the project was appropriated in Summer of 2020. Project was advertised for construction bids in Summer of 2020 with construction beginning in Summer of 2021. This project was in the easement acquisition and permitting stage during 2020. 

Schedule

Date Activity
Summer 2018 Project Design Complete
Summer 2019 Permitting Complete
Summer 2020 Easement Acquisition Complete
Summer 2020 Project Bid Complete
Summer 2021 Project Construction Begins
Spring 2022 Project Construction Complete