Water and Sewer

Harris Creek Interceptor Replacement

Replacement project to prepare sewer system for future demands.

The project will replace approximately 6000 feet of the existing sewer interceptor, which is undersized. The existing 12-inch and 15-inch pipe will be replaced with 30-inch pipe. The project is driven by capacity issue caused by growth in the Rolesville area.

Project Details

 
Type:
Water and Sewer
Budget:
$3,200,000
Project Lead:
Matt Cotton, PE
Contractors:
Moffat Pipe, Inc.

Contact

 

Matthew Cotton, PE
Senior Project Administrator
Phone: 919-996-3528 
Office Location: 1 Exchange Plaza Suite 620
Raleigh, NC 27601

Lead Department:
Water

Subscribe

 

Planning

This Phase is complete.

Lead Department:
Water

Design

This phase is complete.

Lead Department:
Water

Right of Way Acquisition

Permitting has started.

Lead Department:
Water

Construction

The project has bid and a contractor is under contract. Construction began in Winter 2022 and is expected to be completed by Summer 2022. Construction should be complete in six to nine months.

Lead Department:
Water

Complete

Phase details coming soon.

Lead Department:
Water

History

Design competed in May 2020 with permitting and easement acquisition in June 2020. The project was bid in late summer 2020. 

Schedule

Date Activity
Spring 2020 Project Design Complete
Summer 2020 Permitting Complete
Summer 2020 Easement Acquisition Complete
Summer 2020 Project Bid Complete
Winter 2022 Project Construction Begins
Summer 2022 Project Construction Complete