Improving street safety for motorists, pedestrians and bicyclists while improving the living conditions for residents along a street

This project includes the installation of traffic calming devices along Currituck Drive from Tyrrell Road to Lassiter Mill Road and sidewalk construction on the northeast side.

The Currituck Traffic Calming Project is a product of the City’s Neighborhood Streetscape Program.

Project Details

 
Type:
Streets
Project Lead:
Roadway Design & Construction

Contact

 

Grady McCollum, PE
Project Manager
919-996-3762

Comment Form

Lead Department:
Engineering Services
Participating Department:
Transportation
Service Unit:
Roadway Design and Construction

Subscribe

 

Design

The design elements for this project include bump-outs and medians.  We will also add a sidewalk along Currituck Drive from Tyrell Road to Lassiter Mill Road along the northeast side.

Next Steps

 

A pre-construction public meeting is scheduled to take place in January 2020.

Phase Contacts

 

Grady McCollum, PE
Project Manager
919-996-3762

Comment Form

Lead Department:
Engineering Services

Construction

Update September 2020

The contractor has completed the majority of work on the project. Work has started on the new medians and bump-outs along the roadway. Crews are also working on filling any gaps on the sidewalks, and then they will focus on installing the new pavement markings. 

The project is under construction. Crews are expected along the corridor between the hours of 7:00 a.m. and 6:00 p.m. Monday through Friday. Daily lane closures can be expected throughout the duration of the project from (9:00 a.m. to 4:00 p.m.). One lane of traffic will be maintained at all times, and flaggers will help safely direct motorists through the work zone.

We thank residents for their patience and will make every effort to minimize any inconvenience.

New sidewalk being installed on Currituck Drive

As part of the traffic calming project along Currituck Drive we are installing new sidewalks. 

Next Steps

 

Median and bump out installation. 