Jump To:
Location
The subsurface gravel wetland and linear bioretention will be constructed in highly visible areas to both vehicular and pedestrian traffic along Peterson Street and the Little Rock Trail (image right).
The area is host to a range of stormwater projects; including the soon to be installed subsurface gravel wetland and nearby linear bioretention cell, and the existing cistern, permeable pavement, and rain garden located across the street at the Norman and Betty Camp Education Center (located within Walnut Creek Wetland Park). The project is also located next to Carnage Middle School and less than 1 mile away from Fuller Elementary School.
The applicant is encouraged to think about placing a permanent educational display primarily at the gravel wetland but also potentially near the bioretention location, as well as possible temporary community murals along the nearby sidewalks/curbs or stream fencing. The City is especially interested in a display that is functional, interactive, and engages nearby neighbors and passersby to stop, learn, and enjoy the stormwater features.