Stormwater Design Manual - Erosion and Sediment Control

Draft Chapter 6

This chapter provides information on erosion and sediment control requirements. You'll need to follow this criteria when doing any land disturbing activities during construction. The chapter includes information on design:

  • Development;
  • Practice standards; 
  • Application requirements; 
  • Construction phasing and sequencing; 
  • Groundcover vs. stabilization; 
  • Single-family construction; 
  • Compacted pervious areas; and,
  • Post-construction stormwater devices

Review Chapter

Related Documents

Contact

 

Ashley Rodgers, PE, CFM
Stormwater Review Manager
919-996-3970

Department:
Engineering Services
Service Categories:
Stormwater
Related Services:
Stormwater Design Manual

Subscribe