Front Yard Parking


Jump To:

 
Residential Approvals or Permits Issued Submittal Requirements Expected Processing Time Fees Residential Driveway Installation

Residential

A property owner must obtain a zoning permit for the construction of any new front yard driveway or expansion of front yard parking for a single-family detached home or duplex dwelling.

Citywide Parking Regulations:

  • Driveways and parking within the front yard of single-family detached dwellings must be constructed of non-erodible surfaces such as asphalt, concrete or pavers or four inches of gravel with permanent borders. Driveways and parking may cover a maximum of 40 percent of a front yard.

Special Residential Parking Overlay District Parking Regulations: (UDO Section 5.6.1.)

  • Driveways and parking within the front yard of single-family detached dwellings must be constructed of non-erodible surfaces such as asphalt, concrete, or pavers or four inches of gravel with permanent borders. Otherwise, parking must be restricted to single-file parking in front of the driveway cut.
  • Parking must be limited to the driveway plus an area to accommodate two additional parking spaces of 380 square feet or 40 percent of the front yard area, whichever is less. This regulation applies to gravel, grass, or other non-erodible surfaces constructed after July 19, 2012, when the regulation became effective. Surfaces of asphalt, concrete, or pavers that exceed the maximum may remain if they existed prior to July 19, 2012.
  • Vegetative screening is required for new parking spaces that face the side property line. Screening is required along the side of the parking space parallel to the street.

Approvals or Permits Issued

Zoning Permit

Submittal Requirements

Type Description
Required for Submittal
  • E-mail the following documents to: DowntownDS@raleighnc.gov
  • Residential Permit Application: (Enter the “Work Type” as “Other” and put Residential Front Yard Parking Expansion in the blank).
  • Scaled Plan Drawing showing: Property lines; Existing structures; streets with labels; the proposed driveway with dimensions; the total square footage of the driveway; front yard measurements; and the total square footage of the front yard.

Expected Processing Time

Please allow up to five business days for processing.

Fees

Residential Driveway Installation

If your proposed driveway includes new or modified connections to the right-of-way/existing street review the Residential Driveway Installation web page for further instruction.

Contact

 

Planning and Development
Customer Service Center
Customer Request Form
919-996-2500

Subscribe

 
Lead Department:
Planning and Development
Service Categories:
ZoningPermits - Zoning